Skipped Subgrade Work
Caliche hardpan left in place shifts under load, causing the base to crack within a few seasons.
Caliche Removal First
The builder breaks through hardpan and compacts a stable sub-base before any base layer is poured.
New Court Build
A full-size court built from subgrade to finished surface, ready for years of play in desert conditions.
Built Right or Built Again
Caliche hardpan left in place shifts under load, causing the base to crack within a few seasons.
The builder breaks through hardpan and compacts a stable sub-base before any base layer is poured.
A base graded without a precise slope traps monsoon water near the baseline, creating puddles and soft spots.
The base is graded to a controlled slope so water clears the court surface after every rain event.
Drainage channels bolted on after the base is set rarely integrate with the slope and fail under heavy rain.
Drainage paths are designed and formed during the base stage, not retrofitted once the slab has cured.
Net posts anchored to the finished surface rather than set in concrete sleeves pull loose under net tension.
Post sleeves are cast into the base during the pour so they are structurally part of the slab, not an afterthought.
Scope of Work
Each phase is priced separately in the written estimate so you know exactly what you are paying for.
Caliche and unstable soil are removed, the ground is leveled, and the sub-base is compacted to a stable depth.
The base is poured and graded to a precise slope, typically 1 percent, so water drains clear of the playing surface.
A UV-stable acrylic system is applied in multiple passes after the base has fully cured, matched to desert conditions.
Perimeter and subsurface drainage is designed into the base stage to handle intense monsoon rainfall without pooling.
Regulation lines are painted to ITF dimensions once the surface coat is dry and the color has been confirmed.
Posts are set in concrete sleeves during the base pour; fencing and lighting are scoped and priced as separate line items.
Full-size build on large Arizona residential lots.
Multi-court layouts for shared residential facilities.
Regulation builds for organized play and instruction.
Why Choose Us
Accountability at every stage, from the first site visit to the final sign-off walkthrough.
The site visit checks soil and slope before a single number is quoted.
Base prep, drainage, surfacing, and line striping are each listed as a separate cost, no bundled guesswork.
Slope tolerance, line accuracy, and net height are verified on-site before the project is considered complete.
Site assessments are scheduled across Arizona, so projects statewide account for the local soil.
Caliche soil, monsoon drainage, and UV exposure are factored into every base and surface recommendation made.
The Process
Submit your site details and a site visit is scheduled to check soil conditions and measure the space.
You receive an itemised written estimate covering every phase, grading, base, drainage, surfacing, and lines, before work starts.
The court is built phase by phase, then a final walkthrough confirms slope, line accuracy, and net height before handover.
Pricing Estimates
| Job | Typical cost |
|---|---|
| Residential tennis court resurfacing | $3,500-$6,500 |
| Commercial or club tennis court resurfacing | $6,000-$12,000 |
| Full court construction | $80,000-$120,000 |
Common Questions
Guide prices run from $3,500-$6,500 (Residential tennis court resurfacing) to $80,000-$120,000 (Full court construction). An on-site evaluation and itemised written estimate are provided before any work begins, so you know exactly what you are paying for.
Surface type, site grading, drainage requirements, and fencing are the biggest cost drivers. A flat lot with stable soil costs less to prepare than a sloped or rocky yard. Asphalt base courts typically cost less than post-tensioned concrete, and acrylic surfacing adds to either option.
Yes. The itemised written estimate covers base preparation, surfacing, drainage, and line marking. Nothing is bundled into a single number, each scope item is listed separately so you can see what you are approving.
A regulation singles court is 78 feet long by 27 feet wide, but the recommended total footprint including run-off space is 120 feet by 60 feet. Adding fencing and a surrounding buffer typically brings the full site requirement to around 7,200 square feet.
It depends on whether your yard can accommodate roughly 120 by 60 feet of usable, reasonably flat ground. An on-site evaluation checks dimensions, slope, soil, and setback requirements before any design work begins, so you get a clear answer specific to your property.
Asphalt base with acrylic coating is the most common choice, lower upfront cost, durable in Arizona heat, and easy to resurface later. Post-tensioned concrete resists cracking better over time but costs more initially. Modular tiles suit temporary or budget-conscious installs with easier repairs.
Post-tensioned concrete slabs for tennis courts are typically 4 inches thick with tensioning cables spaced roughly 4 feet apart. Standard unreinforced concrete at that thickness cracks under Arizona’s thermal cycling, which is why post-tensioning or a well-compacted asphalt base is the standard recommendation.
An asphalt base with acrylic surfacing is the lowest-cost permanent option. Skipping fencing or using modular tiles over an existing slab reduces upfront spend further. Cutting corners on base compaction is not a saving, poor base prep is the leading cause of cracking and resurfacing costs within a few years.
We cover Tennis Court Installation in and around Arizona, including Oro Valley, Marana, Prescott, Prescott Valley, Green Valley, Lake Havasu City, Phoenix and Scottsdale. If your area isn’t listed, send us a quick message to check.
Every enquiry starts with an on-site evaluation and an itemised written estimate, no commitment required.