The build starts with a site assessment and drainage check. Base flatness, surface condition, and drainage slope are all evaluated before any surface system is specified. Arizona’s caliche and hardpan soil can affect drainage planning on sites without an existing slab, and any base that holds standing water after monsoon rain will accelerate surface coating wear and panel joint failure over time.
Surface system selection follows the base assessment. Sports tile panels install over a concrete or asphalt base, interlock without adhesive, and can be replaced section by section if a panel cracks or degrades from UV exposure. Coated concrete is the alternative where a harder, faster skating surface is preferred, surface coating is applied in layers and selected for heat tolerance, since Arizona’s outdoor temperatures accelerate coating breakdown on systems not rated for high UV exposure.
Goal area layout and rink boundary markings are applied after the surface system is complete. Slip resistance is checked across the full court surface before the court is handed over. A final walkthrough confirms surface flatness, drainage, boundary line accuracy, and panel or coating condition so the court is ready for use.