Skipped Excavation
Laying base material over Arizona’s caliche without digging to a stable layer leaves the surface with nowhere solid to sit.
Depth-First Digging
The builder excavates to a confirmed stable layer, removes loose caliche, and compacts road base before any surface work begins.